Austin American-Statesman - 10/8/08
Residents of an Austin, Texas, neighborhood undergoing a federally mandated sewer replacement noticed that, for several weeks starting in September, the work crews would spend the first three hours of their 12-hour days digging a huge hole in the street, and the last three hours re-filling and paving over it (repeating the process each day). The 20-by-20-by-20-foot hole in Monroe Street was too big to be covered with metal plates, and the city's "policy" of minimal traffic disruption required repaving for nighttime use, at least doubling the cost of the work.
No comments:
Post a Comment